30/9/13
3/10/13
Finalised our wardrobe design!
4/10/13
PCI - all went well only a few minor things were found.
# There was an imperfection on a kitchen cupboard door.
# The fans that were installed didn't have the switch to tune on and off.
# Few paint touch ups
Overall very happy with the house!
Handover next Friday the 11/10/13. Appliances will be installed after the 15th as the range hood was out of stock.
Booked the delivery of our tiles for the Friday arvo.
Tiler starts Saturday 12/10/13