Sunday, 27 October 2013

Post Build update!

Monday 28/10/13
Alarm installed


Tuesday 29/10/13 
Ferniture delivered 

Sunday 3/11/13 
Wardrobe installed 

Tuesday 5/11/13 
NBN installed 


Friday 8/11/13
Optus installed phone line and internet. However not working. So the NBN tech will need to come out again. 

Range hood finished getting installed. However there was a dent in it so they took it back to cut another one to size.

Finished cutting out for the retaining wall.
Blocks ordered. Going to look awesome.


9/11/13
Driveway and brick fence quote done. 

12/11/2013
Had an engineer come out to have a look at the retaining wall and fence we want to do as part of the landscaping 

13/11/2013
Retaining wall blocks delivered


14/9/13 
Our phone and internet are finaly connected. 