Alarm installed
Tuesday 29/10/13
Ferniture delivered
Sunday 3/11/13
Wardrobe installed
Tuesday 5/11/13
NBN installed
Friday 8/11/13
Optus installed phone line and internet. However not working. So the NBN tech will need to come out again.
Range hood finished getting installed. However there was a dent in it so they took it back to cut another one to size.
Finished cutting out for the retaining wall.
Blocks ordered. Going to look awesome.
9/11/13
Driveway and brick fence quote done.
12/11/2013
Had an engineer come out to have a look at the retaining wall and fence we want to do as part of the landscaping
13/11/2013
Retaining wall blocks delivered
14/9/13
Our phone and internet are finaly connected.